The bathroom is officially completed! As usual, several steps took much longer than we had hoped.
The grouting and sealing went well, and there were no surprises there. Each coat of sealant in small areas like this takes less time to apply than to clean up from. A day needs to pass in between coats, and we were aiming for three coats. Luckily, this is a task custom made for weeknights after work.
Our first unexpected roadblock was with the light fixture. When we took down the old one, we found that there was no junction box behind it. Putting in a junction box isn't usually too hard, so we didn't think this would be much of an issue. Oh, little did we know. When I started looking seriously at planning the junction box installation, I realized that with the location of studs and pipes it was going to be more off center than expected (and a bit of a challenge to put in.) When we held up our light to the actual location it be in, we found that it was too wide and would be hitting the wall on one side. Back to the drawing board (or lighting store, as the case may be.)
It took us a week to find a light we liked, and since that was in a catalog it took another week for delivery. It's these little extra bits that are killer to projects and really drag them out. We had tried to be good about getting everything in advance but alas, twas not to be. |
No comments:
Post a Comment